TEXT OF READING 4905-61
Text
Date: 7/16/1926 Sex: M ReadingID: 12986
This Psychic Reading given by Edgar Cayce at his office, 115 West 35th Street, Virginia Beach, Va., this 16th day of July, 1926, in accordance with request made by Mr. M. B. Wyrick.
[Edgar Cayce; Mrs. Cayce, Conductor; Gladys Davis, Steno. Dr. T. B. House.]
Time of Reading 4:30 P. M. Eastern Standard Time. Bosque County, Texas.
-
GC: You will tell us the condition of operations at the present time, and give us any information that will assist and insure the success of these operations, and will answer any questions regarding same I may ask you.
-
EC: Yes, these we have had here before.
-
Now, as has been given, this setting of the casing, the condition as regarding same is being handled in the only feasible way and manner, raising same and running the tools through same to indicate the various changes as are necessary for the condition. That is, RAISE casing, see, for the correct amount of the length to allow the projection that pushes the casing out of line, to become so settled as to prevent this unlining, or unplumbing of the casing, see?
-
With the correction of this we will find we may bring in this in a very short time, for the drilling as is necessary after this is cleansed will not be but little, see?
-
(Q) Why were they unable to get tools on bottom so they - (A) (Interrupting) Just as has been given. When an opening is out of line in thirty feet, forty feet that’s straight will not pass through a crook, see?
-
(Q) Is there anything of which they should be warned? (A) That as has been given.
-
That is all the questions.
-
We are through with this reading.
Reports
Reports & Follow-up
R1. 7/16/26 EC’s wire to Mr. Wyrick:
To M. B. Wyrick Morgan, Texas.
WILL BE NECESSARY TO RAISE CASING UNTIL THE PROJECTION THAT CAUSES THE CURVE IS OVERCOME I HOPE THINGS ARE GOING BETTER THE FULL READING IN MAIL.
COLLECT EDGAR CAYCE
R2. 7/17/26 EC’s ltr. to Mr. Wyrick:
Dear Mr. Wyrick:-
It looks like that troubles never cease. I’m in hopes, however, that Pat has been able to handle the situation before this, and that things are going along alright. I feel very sure it isn’t going to be long now before you’ll be saying it’s on top of the ground. You know I am very anxious, and we would like to be of help if it’s possible.
Let us hear from you whenever possible. With kindest personal regards from all,
Sincerely, Edgar Cayce EC:GD
R3. 7/27/26 Wire:
AM 2 42 DB38 47 NL MORGAN TEX 26
M B WYRICK 427 SOUTH LASALLE ST CHICAGO ILL.
JOINT CASING TILTED OVER IN CAVE BAILER STICKS NEAR BOTTOM TOOLS PICK UP AT USUAL PLACE PAT IS AFRAID TO TRY SET CASING WITHOUT CEMENTING BUT SUGGEST RUNNING CASING TO NEAR BOTTOM OF HOLE THEN USE TRIP SCHWAB TO REMOVE WATER THEN CAN RUN CEMENT THROUGH CASING G C MARTIN
R4. 7/27/26 Wire:
G C MARTIN MORGAN TEXAS
WHAT DO YOU ESTIMATE COST OF YOUR PLAN WILL IT BE NECESSARY TO BAIL WATER
M B WYRICK
R5. 7/27/26 Wire:
PM 1 20 HSA231 41 BLUE MORGAN TEX 27 1250P
M B WYRICK 427 SOUTH LASALLE ST CHICAGO ILL.
MARTIN IN CLEBURNE CEMENT EIGHTY CENTS HUNDRED CONSET TWO DOLLARS GALLON SIZE OF CAVITY TO FILL UNKNOWN TO US WOULD BE NECESSARY TO RUN PIPE IN AND HOLD IN SPIDER OFF BOTTOM AND SWAB WATER THROUGH SAME TO GET BEST RESULTS P J MORAN
R6. 7/27/26 Wire from Chicago:
P J MORAN % G C MARTIN MORGAN TEXAS
DO YOU THINK ONE HUNDRED CUBIC YARDS CEMENT WOULD BE SUFFICIENT ABOUT WHAT WOULD THIS COST IN PLACE
M B WYRICK
R7. 7/28/26 Wire:
AM 3 57 B22 36 NL MORGAN TEX 27
M B WYRICK 427 SOUTH LASALLE ST CHICAGO ILL.
BEST FIGURE ONE HUNDRED CUBIC YARDS CEMENT BOUND IN CONSET ALL LOWERED CASING AND ALL SET READY TO START DRILLING IS THIRTY TWO HUNDRED DOLLARS MAILING DETAILED ESTIMATES THIS INCLUDES EVERYTHING READY FOR DRILLING THRU CEMENT.
G C MARTIN
R8. 7/28/26 Mr. Wyrick’s ltr. to EC:
The Western Union Telegraph Company, Inc. (Letterhead) Plant Department, Chicago
Dr. Edgar Cayce, 115 West 35th St., Virginia Beach, Va.
My dear Cayce:-
I received the reading you sent to Morgan and you certainly seem to be talking about conditions in that well, but for some reason we continue to encounter unforeseen difficulties which cause delay and increase expense to the extent that I sometimes fear will not be successful in financing to the finish.
When we ran the 4 1/2 inch casing the first and second joints on the bottom buckled so that we could not run the tools thru. We then pulled the casing and left the bottom joint in the hole. Exploring with the tools show that the joint has fallen over in the cave place along with the lost bailer. Judging from the manner in which the casing is bent and the collars bursted, the depth of the cave must be about 45 feet, as the two lengths of casing are 22 feet and a fraction each.
The third joint was not bent any but the bottom collar pulled considerably out of shape. The reason for the casing buckling was due to the large opening where there was no support on the side to stop the casing from bending out under the combined weight of the 5955 feet which we had in the hole.
We are now planning to rerun the casing, holding it suspended some few feet off the bottom and then fill in with concrete, mixed with a liquid known as Conset, this, I suppose, to insure setting at the extreme depth and under the extreme heat which it will be subject to.
I wish you would try to get all the information you can on this process and advise if it is practical and if by cementing we will be able to drill thru in line with and enter the hole that we had drilled to a depth of 6100 feet in the lime, thereby saving time and expense to drill a new hole in the lime.
With best wishes for yourself and family,
Yours very truly, [signed] M. B. Wyrick MBW.MP
QUESTIONS
Is the lost bailer standing straight in side of hole? How does the lost length of casing lay in hole? How big in diameter and depth is the caved section below 5900 feet?
R9. 8/1/26 See 4905-62.
Background
Background
B1. See 4905-60. There is no record of a request for 4905-61, but there must have been a wire or phone call. GD.
Generated research index
Index (LLM-extracted)
Summary
Edgar Cayce gives guidance on correcting a crooked casing in an oil well, advising to raise the casing to overcome a projection, while subsequent telegrams discuss cementing plans and costs.
People: M. B. Wyrick, G. C. Martin, P. J. Moran, Pat
Places: Virginia Beach, Texas, Chicago
Referenced readings: 4905-60, 4905-62
Mentioned Entities
Chicago, Texas, Virginia Beach, Gertrude Cayce, Gladys Davis
Source: The Complete Edgar Cayce Readings, A.R.E. CD-ROM (2006). Reading 4905-61, ReadingID 12986.